Glue Floor
Try to leave minimal gaps, because the better the tiles adjacent to the nearest surface, the stronger finish. Most often, first veneer floors, and then the walls, but it happens and vice versa. In the first case in wall covering tiles directly pressed to the floor tiles. In the second version of the bottom row of tiles bonded at some distance from the floor, so that could then put a layer of cement glue and floor plitku.Dlya such purposes, I usually They are used metallic profiles, which are bolted to the wall, exposing the horizontal level, and snow was beginning to stowage In I recommend paving mix items from several boxes. Laying start from the bottom.
The wall surface coat from the bottom up horizontal rows. Between the tiles retain a place in the seam. Gentle pressure tile adhesive on the base, tightly pressed to the surface of the tile. You can slightly move the tiles on the wall until the glue is not dried up, in order to bring them closer to or farther from each other. After laying the tiles and hand presses remove excess mortar until it is uniform seams zatverdel.Dlya use krestiki.Obychno joints have a width of 1.5 – 3 mm, and ceramic tiles in large sizes – 5 mm.
It depends on your desires, as well as the conditions for further Operating veneered surfaces: the higher the temperature difference, the higher the load on the surface (the floor, the pedestrian zone, the steps:) – the greater the width of the seams is recommended. The most important thing in the tiling-compliance level, as vertical and gorizontalnogo.Maleyshy failure can undermine all the work there. Here are some more, I think the important points: – If you are using in remote crosses, try to retrieve them after fixing adhesive, but until it is completely dry. Both figures, as a rule, manufacturers of glue on the package indicates, since time is highly individual and depends on the composition of the adhesive.